River |
Radhi Khola |
Location |
Marsyangdi Gaupalika -5, Germu, Lamjung |
Catchment Area |
17.0 km2 up stream intake
|
Design Discharge |
0.874 m3/sec |
Gross Head |
617 meter |
Installed Capacity |
4.4 MW |
Length of Weir |
28.5 meter |
Size of Settling Basin |
2 Chamber each of 55m x 9m x 3.9m |
Particle Size to be settled |
0.20 mm |
Length of Headrace |
714.83 meter |
Penstock Pipe |
Complete Mild Steel Surface, Length 1025.0 m |
Power House Type |
Surface with 2 units Turbine-Generator Set |
Type of Turbine |
Pelton |
Generator Type |
Brushless Synchronous 3-phase AC |
Total Energy |
26.267 GWh |
Wet Energy |
21.17 GWh |
Dry Energy |
5.09 GWh |
Transmission Line & Interconnection Point |
33 kV, Chiplabesi Substation, Lamjung District |
Commerical Operation Date (COD) |
31 Jestha, 2071 |